Most of the day's success actually came from decisions made (not made on the day) before we arrived at any point of the shoot. This post is about that planning, and how we lined up the day's order, and selected the location… before we had captured one single shot.
After dealing with some of the issues we faced with location on our test shoots, we had to plan this one, in order to have it not be a wild card. Shooting day happens to be the day the primary school students are going to head outdoors for their co-curricular time, so they were out for the day and we did not need to compete or work around the second floor classroom. During the shoot knowing that that room was empty meant that we wouldn't need to interrupt or have to move to a different room. It was just a bit of planning but that's what can make the whole day happen without any location scramble!
Schedule background actors first.
Nor was the order of the day determined by luck, either. The least reliable group is always background actors, because they have other classes and commitments outside of our shoots; if we didn't have them in our scenes until later in the day and they dropped off the grid, we wouldn't have been able to get our group shots. Erasing that risk required me to plan the entire scheduling around getting everything that had to be done with everyone in the group done first while we had everyone left, and making sure that anything that was more suited to the two leads was scheduled to the last minute of the day. The fact that something went wrong in that one scheduling decision saved the rest of the day - by the time there were problems later on, it wasn't the background actors that we had to watch.
This isn't about continuity for the sake of convenience, it's about continuity for the sake of continuity.
We had also to arrange the order in a logical fashion based on when people were available and when they weren't. The meeting of our two protagonists had to appear as one long day's shot and so we knew we would be shooting this in the evening. Structured thinking about lighting and blocking meant that we didn't have anything that would show in the cut between the morning and evening shots, as it's not something we'll be able to edit. It was all planned when we were making the schedule.
Identifying and accommodating or managing risks that are recognized.
Lastly, we did our planning with our own errors and not thinking they would come back. For our AS level project it wouldn't have been a problem if a prop in frame hadn't been found until the edit as we'd lost an entire day of reshooting because of that. On the day of the shoot we knew we needed to make sure there were checks in place as we didn't want to just let our luck happen when we were finished and go back and film that again - that's why on the day of our shoot we made sure there were checks scheduled.
Nothing of this planning ever came into play on the day itself - it meant we all made do with the day, instead of the day falling apart like our AS level shoot.